Offshore
2006
1. Completed trouble shooting of ESD panels Live system for FPSO at Turret.
2. Completed Heavy Oil Injection skid calibration of Live system for FPSO at Turret.
3. Completed Cargo Control system calibration of Live system for FPSO at main deck.
2005 to 2009
4. Completed WellHead Control Panel (WHCP) Calibration / Service Live system on MOPU at Christmas Tree area.
2009
5. Completed Sub-sea HPU Calibration / Service Live system for FPSO Soft Yoke Mooring system.
2009 to 2010
6. Completed Constant Tensioning system Calibration/Modification / Service Live system for FPSO Soft Yoke Mooring system.
2010 to 2014
7. Completed Testing/ Trouble shooting / Commissioning and Maintenance Live systems in pump room on Drilling Rigs.
8. Completed Survey on all hydraulic systems in pump room/topside while in production for all clients on Drilling Rigs.
9. Completed Testing/ Trouble shooting / Commissioning and Maintenance Live systems in pump room of Supply vessels.
2015
10. Completed Cargo Valve Control System and Actuator Survey / Maintenance at Main deck/Pump room/Tanks of FPSO.
2016
11. Completed Cargo Valve Control System modification at Main deck of FPSO.
2021 – 2022
12. Completed commissioning of entire FPSO, including all Hull and Topsides systems. Delivery to Client prior first oil and gas start-up at offshore location.
13. Completed commissioning of main Ballast hydraulic control systems, including Control Systems and Actuator surveys and refurbishment / commissioning. support for FPSO tow to site.